Products
- Home
- Products
PROTOTYPE AND BATCH PRODUCTION FACALYTIES
- Ferrous And Non-Ferrous Casting Parts (Sand, GDC, HPDC)
- Fibreglass Reinforced Plastics (FRP) Parts.
- Block Machining (Induction & Case Hardening)
- Design & Manufacturing of Pattern, Die And Mould
(All types of Tool Room Work) - 3D Printing.
- Sheetmetal And Fabrication Parts**
- Plastic Injection, Compression Moulding Parts**
- Vacuum Forming**
- Rubber Parts**
Alluminium Casting
Ferrous Casting
Casting + Machining + Grooving
Machining + Induction Hardening
Barstock Machining (Carving)
Fibreglass Reinforced Plastics (FRP)
Sheetmetal Parts
Fabrication
Plastic 3D Printing (FDM)
Plastic – 3D Printer
Machine Name (FDM) Bed Size (X*Y*Z)
MAKE 3D 500X50X250
DIVIDED BY ZERO 300X250X250
Materials :- ABS, PLA etc.
Fibreglass Reinforced Plastics (FRP)
CAPACITY :--
PART SIZE – 0 TO 5 Mtrs.
FINISHED – BOTH SIDE (A surface + B surface)
MATERIAL – GLASSMATE, RASIN etc.
Quality Assurance
Machine Name Accurate - SPECTRA
Bed Size (X*Y*Z) 600X500X400
Index Angle 360◦ degree
Facility – Ferrous Sand Casting
Production Capacity :-
➢ Casting Weight Range –
▪ Sand Casting – 0.0500 kg to 120 kg 1 job
▪ Gravity Die Casting – 0.050kg to 10 kg
▪ Pressure Die Casting up to 0.010 kg to 3.5 kg
➢ Standard Room & Spectro Lab -
▪ We follows the most commonly used quality core tools such as APQP, PPAP & SPC to ensure world
class quality assurance .
Facility – Ferrous Sand Casting
Production Capacity :-
➢ Casting Weight Range –
▪ Sand Casting – 0.0500 kg to 120 kg 1 job
▪ Gravity Die Casting – 0.050kg to 10 kg
▪ Pressure Die Casting up to 0.010 kg to 3.5 kg
➢ Standard Room & Spectro Lab -
▪ We follows the most commonly used quality core tools such as APQP, PPAP & SPC to ensure world
class quality assurance .
CASE STUDIES
FRONT HUB
▪ Process – Sand Casting
▪ Pattern – Wooden / Aluminum
▪ Material – SG500/7
▪ Qty – 20nos.
▪ Timeline – 4 weeks (Machined)
ALUMINIUM BRACKET
▪ Process – Sand Casting
▪ Pattern – Wooden / Aluminium
▪ Material – LM24
▪ Qty – 10nos.
▪ Timeline – 4 weeks (Machined)
CLUTCH RELEASE FORK
▪ Process – Block Machining + Induction Hardening
▪ Material – EN19
▪ Qty – 30nos.
▪ Timeline – 4 weeks (Induction Hardening)
DUCT
▪ Process – Fibreglass Reinforced Plastics (FRP)
▪ Material – Glassmate
▪ Qty – 30nos.
▪ Timeline – 4 week